Packet to be completed by any Installer or General Contractor installing or causing to be installed, a Residential and or NonResidential Distributed Generating (DG) Facility, including leased systems, in the Trico service territory.
Documents to aid you in obtaining electric service or interconnecting with Distributed Generation (i.e. solar or backup generator) to Trico’s electric distribution system.
Specifies the technical requirements for the safe and effective interconnection and operation of a Generating Facility in parallel with the Trico Distribution System.