Skip to content
  • Home
  • About
    • Our Team
    • Board of Directors
    • Trico Lore
    • Careers
    • Contact
    • Projects
    • News
    • Governing Documents
  • Residential
    • Billing
    • Construction
    • Start/Stop/Transfer Service
    • SmartHub
  • Commercial
    • Construction
    • Pole Attachments
    • Economic Development
  • Tools & Resources
    • Residential
      • Outage Center
      • SmartHub
      • Understanding Your Rates
      • Ballpark Estimate Tool
      • Bill Pay Assistance
      • Meter Maintenance
      • Weatherization Kit
    • Commercial
      • Line Extension Policies
      • Pole Attachment Guide
      • Requirements
      • Property Search & Analysis
      • Installer Resources
  • Programs
    • Solar
    • Electric Vehicles
    • Energy Efficiency
      • Education Programs
      • Home Energy Savings
      • Tree Program
    • Energy Solutions
      • Thermostat Program
      • Energy Rebates
      • Community Solar Rate
      • Renewable Energy Boost Rate
      • EV Time of Use Rate
      • EV Unlimited Rate
    • Safety
  • Trico Advantage
    • Scholarships
    • Washington Youth Tour
    • Membership Equity
    • Trico Connections Card
  • Community
    • POWER Grants
    • Nonprofit Partnerships
    • Scholarships
    • Operation Round Up
    • Washington Youth Tour
    • Trico TV
    • Support
    • Events
  • Trico Fiber
Outage Center
Login to SmartHub
Pay Bill
Outage Center
Login to SmartHub
Pay Bill
Two Way Chat Page

Subdivision Service Application - No Uploads

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
MM slash DD slash YYYY
New Service Address (not Billing or Office Address)*
Service Panel Size (Amps)*
Electric service location per site plan?*
Is this a model home?*
Is this a Cross Lot?*
MM slash DD slash YYYY

Billing Account Fees:

$100.00 New Service Establishment Fee plus applicable taxes will be billed on your first bill. (one-time charge).
New Construction Fees:
  • Line Extension Costs all applicable fees (to be determined at a later date) shall be paid to the Cooperative, prior to construction. (See rule 208 of Trico's current R,R,&LEP)
  • An agreement and invoice (if applicable) will be sent to the agreement authorizer listed in the application. The Applicant will need to advance a non-refundable contribution equal to the total estimated cost for the installation of all required facilities for the line extensions.
    • Once the agreement is signed and the invoice is paid, our Construction Schedulers will promptly contact the Applicant once the work order has been released.
  • If the cost is covered by the allowances of a Permanent Residential Applicant, the work order will be released. After the work order is released, our Construction Schedulers will promptly contact the applicant to schedule the necessary construction and installation.

Responsibilities of the Applicant:
  • The Applicant is responsible for trenching, backfill, and conduit required for the line extensions.
  • For Material Pickup (if applicable): The member or contractor will need to schedule a date and time with Trico's Warehouse to pick up materials once the payment has been processed.
    • The Materials Exchange Ticket will be on file with our Warehouse, and the member or contractor will need to provide the work order number for reference.
  • The Applicant may request overall subdivision lot plan detailing transformer and service conduit stub locations. Meter panel should be placed same side of house as service conduit stub-out. Deviation from this plan will result on cross-lot redesign and could incur additional fees.

Scheduling Construction and Meter Installation:
  • Our Construction Schedulers will promptly contact the Applicant once the work order has been released.

Agreement to Accept Service:

I understand that Trico's electric distribution plan will be designed, estimated, and constructed based upon the information provided with this application. Incomplete information or changes made at my request may result in re-design fees and may delay my project. I have read and understand the above application and applicable fees.
MM slash DD slash YYYY
Clear Signature
Menu
  • Home
  • About
  • Residential Members
  • Commercial Members
  • Tools & Resources
  • Sustainable Programs
  • The Trico Advantage
  • Start Service
  • Community
  • Careers
  • Home
  • About
  • Residential Members
  • Commercial Members
  • Tools & Resources
  • Sustainable Programs
  • The Trico Advantage
  • Start Service
  • Community
  • Careers
Our Resources
  • Set Up Power
  • Pay Your Bill Online
  • Report Power Outage
  • Stop & Transfer Service
  • Property Search & Analysis
  • Rates
  • Set Up Power
  • Pay Your Bill Online
  • Report Power Outage
  • Stop & Transfer Service
  • Property Search & Analysis
  • Rates
SmartHub

Sign up for our Member portal, SmartHub, to manage your usage, pay bills, and more.

Enroll In SmartHub
Facebook Instagram X-twitter Linkedin

Trico Electric Cooperative earns this award based on data modeled by the ACSI® in 2026. Award criteria are determined by the ACSI based on customers rating their satisfaction with [CO-OP] in a survey independent of the syndicated ACSI Energy Utility Study. For more about the ACSI, visitwww.theacsi.org/badges. ACSI and its logo are registered trademarks of the American Customer Satisfaction Index LLC.

2026 © Trico Coop

|

Privacy Policy

|

Design by Kodeak

Contact Info

Phone
520-744-2944

Toll Free
866-337-2052

Fax
520-353-1640

Address
8600 W Tangerine Rd
Marana, AZ 85658

Operating Hours
Monday — Friday
8:00 AM — 4:30 PM