I have read and understand the requirements and my responsibilities regarding the type of service I am applying for, I also understand that I must meet those requirements before Trico can extend electric service to me.
By becoming a member of Trico, you agree to follow the policies, rules and schedules of Trico Electric Cooperative, Inc. A copy of the Rules, Regulations & Line Extension Policies approved by the Arizona Corporation Commission (ACC), 402 W. Congress, Tucson, AZ 85701, (520) 628-5555 is available on-line or upon request.
I hereby apply for electrical service at the above location. I understand that Trico will make service available upon completion of engineering details and duly executed contractual agreement between the parties. This application is valid for 60 days from the above date. I agree to accept service when construction is completed.
The design of your line extension will be based on the Rules, Regulations, and Line Extension Policies of Trico and must factor if existing facilities are capable and able of supplying your service requirement, plus responsibilities of the Cooperative and the Applicant, together with system plans of the Cooperative, to determine the most cost effective design, in the Cooperative’s opinion.
These instructions may not cover all situations. Some situations might require special written agreements or studies.