Skip to content
  • Home
  • About
    • Our Team
    • Board of Directors
    • Trico Lore
    • Careers
    • Contact
    • Projects
    • News
    • Governing Documents
  • Residential
    • Billing
    • Construction
    • Start/Stop/Transfer Service
    • SmartHub
  • Commercial
    • Construction
    • Pole Attachments
    • Economic Development
  • Tools & Resources
    • Residential
      • Outage Center
      • SmartHub
      • Understanding Your Rates
      • Ballpark Estimate Tool
      • Bill Pay Assistance
      • Meter Maintenance
      • Weatherization Kit
    • Commercial
      • Line Extension Policies
      • Pole Attachment Guide
      • Requirements
      • Property Search & Analysis
      • Installer Resources
  • Programs
    • Solar
    • Electric Vehicles
    • Energy Efficiency
      • Education Programs
      • Home Energy Savings
      • Tree Program
    • Energy Solutions
      • Thermostat Program
      • Energy Rebates
      • Community Solar Rate
      • Renewable Energy Boost Rate
      • EV Time of Use Rate
      • EV Unlimited Rate
    • Safety
  • Trico Advantage
    • Scholarships
    • Washington Youth Tour
    • Membership Equity
    • Trico Connections Card
  • Community
    • POWER Grants
    • Nonprofit Partnerships
    • Scholarships
    • Operation Round Up
    • Washington Youth Tour
    • Trico TV
    • Support
    • Events
  • Trico Fiber
Outage Center
Login to SmartHub
Pay Bill
Outage Center
Login to SmartHub
Pay Bill
Two Way Chat Page

Recorded Subdivision Service Application - No Uploads

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
MM slash DD slash YYYY

Owner Information

Mailing Address*
Responsible for Contract Signatory?

Responsible Contract Signatory

Mailing Address

Contractor and Engineering Information

Design and Planning Information

MM slash DD slash YYYY
MM slash DD slash YYYY

Lot Information:

Type of Housing or Project

Electrical Information:

Service Voltage
Check all that apply:
Common Usage Area Electric Load:
Please note the new construction fees:
  • A Design Deposit of $75 per lot required to prepare detailed line extension plans. Invoice will be sent out and advance will be applied to the final cost. (See rule 201.B of Trico’s current R,R,&LEP)
  • Line Extension Costs all applicable fees (to be determined at a later date) shall be paid to the Cooperative, prior to construction. (See rule 203.D of Trico’s current R,R,&LEP)
Trico’s Responsibilities:
  • Furnishing Plans and Cost Estimates: Trico is required to furnish plans, specifications, and cost estimates within 45 days of receiving approved development plans, the signed application, and payment of the design deposit fee.

Preconstruction Requirements:
  • Preconstruction Meeting (Pre-Con): A preconstruction meeting must be arranged by the developer or their contractor before starting any trenching or conduit installation for the electric distribution.
  • Pre-Con Invitees: The pre-con meeting should include all pertinent utilities, the developer, relevant contractors, and the engineering firm.

Responsibilities of the Developer:
  • Trenching and Conduit Installation: The developer is responsible for digging, backfilling, and the installation of the conduit system for all trenches related to the electric distribution.
  • Inspection Coordination: If you want to have your distribution installation inspected prior to backfilling or have any questions about Trico's service requirements (such as trench and conduit specifications), contact (520) 744-2944 ext. 2730 to coordinate with a Trico Inspector.

Agreement to Accept Service:

I understand that Trico’s electric distribution plan will be designed, estimated, and constructed based upon the information provided with this application. Incomplete information or changes made at my request may result in re-design fees and may delay my project. I have read and understand the above application and applicable fees.
MM slash DD slash YYYY
Clear Signature
Menu
  • Home
  • About
  • Residential Members
  • Commercial Members
  • Tools & Resources
  • Sustainable Programs
  • The Trico Advantage
  • Start Service
  • Community
  • Careers
  • Home
  • About
  • Residential Members
  • Commercial Members
  • Tools & Resources
  • Sustainable Programs
  • The Trico Advantage
  • Start Service
  • Community
  • Careers
Our Resources
  • Set Up Power
  • Pay Your Bill Online
  • Report Power Outage
  • Stop & Transfer Service
  • Property Search & Analysis
  • Rates
  • Set Up Power
  • Pay Your Bill Online
  • Report Power Outage
  • Stop & Transfer Service
  • Property Search & Analysis
  • Rates
SmartHub

Sign up for our Member portal, SmartHub, to manage your usage, pay bills, and more.

Enroll In SmartHub
Facebook Instagram X-twitter Linkedin

Trico Electric Cooperative earns this award based on data modeled by the ACSI® in 2026. Award criteria are determined by the ACSI based on customers rating their satisfaction with [CO-OP] in a survey independent of the syndicated ACSI Energy Utility Study. For more about the ACSI, visitwww.theacsi.org/badges. ACSI and its logo are registered trademarks of the American Customer Satisfaction Index LLC.

2026 © Trico Coop

|

Privacy Policy

|

Design by Kodeak

Contact Info

Phone
520-744-2944

Toll Free
866-337-2052

Fax
520-353-1640

Address
8600 W Tangerine Rd
Marana, AZ 85658

Operating Hours
Monday — Friday
8:00 AM — 4:30 PM